At the last minute, I decided to run a secondary sewer pipe under the footing for a future bathroom. The existing sewer pipe enters the basement in a weird spot, and I didn't want to be forced in to having a bathroom in a less than ideal location. So I dug a hole under the footing from the outside and dug a trench to intercept our existing sewer connection.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment